Detailed explanation of filter customization process and sampling cycle

2026-11-25 Industry News 16 次浏览

The two most common questions asked by customers who customize filters are "how long will it take to receive samples" and "why can't we ship directly from stock". This article will explain our factory's customization process and sampling cycle in the actual production order, without using official jargon. After reading it, you can roughly estimate how many days it will take from placing the order to receiving the sample, and you also know where the time is spent.

1、 What exactly is a customized filter

Many customers think that customization is just about changing the size, but in fact, it is this series of parameters that affect production arrangements: center wavelength, bandwidth (FWHM), aperture and external dimensions, incident angle (0 ° or 45 °), substrate material, cut-off depth (OD value), and film type.

Different types of filters have different difficulties.Narrowband filterPay attention to half width and rectangularity, and only when the number of layers is increased can there be steep passband edges;Bandpass filterPay attention to the ratio of passband transmittance to cutoff band;Long wave pass filterandShort wave pass filterObserve the steepness of the deadline;dichroic mirrorWe also need to calculate the transmittance reflectance ratio under 45 ° incidence. The more complete the parameters are given, the faster the evaluation of the subsequent plan, which will be mentioned later.

2、 The complete process of customization, six steps

1. Requirement confirmation. Please provide the usage scenarios (fluorescence detection, laser isolation, machine vision, and beauty equipment are all acceptable), spectral requirements, and quantities, and go through the business and technology together to fill in any unclear parameters. If everything goes smoothly, it can be decided on the same day.

2. Scheme evaluation and quotation. Technical film system: how many layers to deposit, what process to use - we use magnetron sputtering route, substrate choice K9, B270 or quartz - then provide price and delivery time. Conventional membrane systems return on the same day, while complex membrane systems take 1-2 working days.

3. Sample production scheduling. After confirming the plan, the order will enter the coating schedule. This is the most time flexible part of the entire process, which will be discussed separately in the third section.

4. Cutting and post-processing. After plating, cut, invert, and clean the film according to the drawing. For those that require bonding, patching, or secondary trimming after plating, this step should be taken.

5. Detect the sample. The spectrophotometer measures the spectral curve and produces a test report based on the agreed acceptance criteria, which is sent along with the sample.

6. Sample confirmation for batch transfer. There is no problem with your acceptance of the samples. The batch production will be reproduced according to the same film system, and the spectral consistency is based on evidence. There will be no situation of "sample can be used, batch distortion".

3、 How long is the typical sampling cycle

According to normal production schedule:

  • Membrane systems with relatively simple structures such as long wave pass and short wave pass take 3-5 working days;
  • Multi layer narrowband film systems such as narrowband filters and bandpass filters take 5-7 working days;
  • For film systems with multiple layers, steep cutoff requirements, or dual band composite, 10-15 working days are also considered normal.

This is the number under regular production scheduling. When the coating machine schedule is full or there are fluctuations in raw materials and personnel before and after the Spring Festival, the delivery date needs to be confirmed separately.

4、 What factors can prolong the cycle

Number of membrane layers. The more layers there are, the longer the coating machine takes up time, and the higher the accuracy requirements for film thickness monitoring. A narrowband film system with more than 40 layers and a 10 layer long wave pass have a time difference of several times.

Base material preparation. We prepare commonly used substrates year-round and directly proceed with production scheduling; Less popular materials or very special sizes need to be purchased now, usually taking 2-4 days.

Alien and multi specification. Circular and square pieces are both regular activities. Alien cutting or a small batch filled with five or six different specifications, with more frequent changes and adjustments, naturally increases the time.

Testing indicators. Acceptance requires scanning a wide frequency band or measuring spectra at specific angles, which takes more time in the detection process. This part is not recommended to be provincial - the indicators are aligned, and there will be no disputes in bulk later on.

5、 If you want to be faster, you can do it this way

One is to give all parameters at once. The most frightening thing is that after making the sample, I found out that the incident angle is not 0 °, so I have to start over from scratch. When the wavelength is shorter than 300nm, the substrate transmittance should also be considered, which will be clarified in the scheme stage.

The second is to accept material bases of similar specifications. If your band requirements allow, use ready-made K9 or B270 materials to prepare, which is several days faster than waiting for special materials.

The third is to align the acceptance indicators in advance. Set the two or three most important indicators as hard indicators (such as center wavelength ± 2nm, OD ≥ 4), and follow the reference values for detection and reproduction around the hard indicators.

Fourthly, if the project is urgent, simply state the timeline. Arrange production in reverse according to nodes, which parameters can be relaxed and which processes can be adjusted. We provide you with several optional solutions, which are much more proactive than scheduling with dull heads.

Conclusion

At the end of the day, the customization cycle of filter=film difficulty+production schedule+speed of parameter confirmation by both parties. You have specific bands, sizes, and quantities on hand. You can send us your requirements and we will first provide you with an accurate delivery date. The company has had its own production lines for magnetron sputtering coating, cutting, and testing since 2010,Company ProfileThere is a detailed introduction to the production line and equipment inside.


Ruicheng Optoelectronics: Established in 2010, using magnetron sputtering and ion assisted hard film technology, customized according to drawings and samples, with samples shipped within 3-7 working days and no minimum order quantity threshold. Customized consultation: 15112422758 (Ms. Liu)/ruiccn@163.com / www.ruiccn.com